Steps to Apply for Net Metering in Pakistan – Step-by-Step Guide
Step 1: Check Official Net Metering Rules (Before Applying)
Step 2: Identify Your Electricity Provider’s Net Metering Page
For Punjab, Islamabad & Other Cities (DISCOs)
Step 3: Download or Open Net Metering Application Form
Step 4: Fill Applicant Information (Exactly as Per Electricity Bill)
Step 5: Fill Electricity Connection Details
Step 6: Fill Solar System Technical Details
Step 7: Upload Required Documents
Step 8: Submit Application & Save Reference Number
Step 9: Track Net Metering Application Status
Step 10: Site Inspection by Utility Company
This guide explains where to apply, which page to open, and what to fill, so homeowners and commercial users don’t get lost during the net metering process.
Step 1: Check Official Net Metering Rules (Before Applying)
Before applying, it’s strongly recommended to understand official eligibility and technical limits.
Official reference pages:
NEPRA Net Metering Regulations (Pakistan)
https://nepra.org.pk/Regulations/NetMetering.php

Step 2: Identify Your Electricity Provider’s Net Metering Page
You must apply through your own DISCO or utility company.
For Karachi (KE Consumers)
K-Electric Net Metering Page
https://www.ke.com.pk/customer-services/net-metering/
For Punjab, Islamabad & Other Cities (DISCOs)
Most DISCOs follow the same NEPRA format:
LESCO – https://lesco.gov.pk
IESCO – https://iesco.com.pk
FESCO – https://fesco.com.pk
MEPCO – https://mepco.com.pk
Step 3: Download or Open Net Metering Application Form
Depending on your provider, you will either:
Fill an online net metering application, or
Download a PDF net meter application form
Example:
KE Net Metering Application Form (available on KE website)
DISCO Net Metering Forms (available on respective DISCO portals)
Step 4: Fill Applicant Information (Exactly as Per Electricity Bill)
Use:
Name (as per bill)
CNIC number
Mobile number
Email address
Mismatch between bill and CNIC is the #1 rejection reason.
Step 5: Fill Electricity Connection Details
Taken directly from your electricity bill:
Consumer / Account number
Meter number
Connection type (single / three phase)
Sanctioned load
Step 6: Fill Solar System Technical Details
This section must match your inverter and system exactly.
You’ll enter:
Total system size (kW)
Inverter brand & model
Inverter capacity
Panel wattage & quantity
System type (on-grid / hybrid)
Step 7: Upload Required Documents
Typical uploads include:
CNIC copy
Latest electricity bill
Solar inverter datasheet
Solar panel datasheet
Single line diagram
Installer company details
Step 8: Submit Application & Save Reference Number
After submission:
You’ll receive a reference / tracking number
Keep it saved for future follow-ups
Step 9: Track Net Metering Application Status
KE Consumers
https://www.ke.com.pk (Customer portal)
DISCO Consumers
Track through respective DISCO customer portals or helplines
Step 10: Site Inspection by Utility Company
Engineers will verify:
Inverter model
Wiring & safety
Earthing & breakers
Compliance with submitted data
Step 11: Net Metering Agreement Signing
Once approved:
Net metering agreement is issued
Agreement must be signed before meter installation
Step 12: Export-Import Net Meter Installation
After agreement:
Old meter is replaced
Net metering officially starts
Excess units begin exporting to the grid